Home About Us Resources Employment Contact Us

Harvey W. Hottel, Inc.

since 1945
Since 1945
since 1945
"we put all our energy into saving yours"
301-921-9599
703-876-9599
18900 Woodfield Road
Gaitersburg MD 20879

"Thank you for another great project! We are going to enjoy our new bathroom and we're looking forward to work with you again."


Contact Form

Please fill in the contact form below and we will get back to you.

  • Name:
  • Email:
  • Phone:
  • Check Here to Recieve Our Newsletter & Special Offers:
  • Message:






close

Projects & Services

Featured Projects

Rio Washingtonian Center
Harvey Hottel, Inc. recently completed the replacement of a 1000 ton cooling tower on the roof of the parking garage at the Rio Washingtonian Center in Gaithersburg, MD.
Rockville Cooling Tower
Harvey Hottel, Inc. based in Gaithersburg, Md. one of the Washington DC area's largest HVAC companies just finished the installation of a new cooling tower...
Winchester Welcome Center
Environmentally friendly Geothermal Heating and Cooling system on the brand new Winchester Safety Rest Area & Welcome Center off Route 81 in Winchester, Virginia.

Featured Services

LEED Certified Green Building Designs
Eventually, green buildings and construction plans will be the industry standard. The team at Harvey W. Hottel refuses to skip a beat. We are the Premier LEED Certified Green Building contractor...
Tailored Maintenance Solutions
We recognize that everyone's requirements are not the same so beyond our standard service agreements we offer agreements "tailored specifically to your needs and requirements".

close

Resources

Projects & Services
Testimonials

Rio Washingtonian Center

Rio Washingtonian Center

Harvey Hottel, Inc. recently completed the replacement of a 1000 ton cooling tower on the roof of the parking garage for the air conditioning system at the Rio Washingtonian Center in Gaithersburg, MD.

The cooling tower replacement was a challenging task. Harvey Hottel had to install a temporary cooling tower, pumps and generators on the ground level of the parking garage. This consisted of rerouting all the existing pipe from the existing tower to the temporary system. Once complete, Harvey Hottel brought in a 300 ton crane to remove the existing cooling tower and place the new system in its place. Harvey Hottel had to set up the temporary system and install the replacement cooling tower in five days. The planning, preparation and execution of the entire project took 3 weeks to complete.

The RIO Entertainment Center has been a gathering place for Gaithersburg residents for many years with restaurants on the waterfront with outside dining, AMC Loews Rio Cinemas 18, the Rio Sport and Health Club and Washington Golf.

Paddleboats are available during the spring, summer and fall months with a Summer Concert series that runs, Friday and Saturday evenings, 6-9pm in the months June through September.



copyright 2011